Pape Electroplating: Roger Oetman 860-229-1414
Job shop plating facility. Cyanide, chrome and general plating waste with a flow of 30 GPM. Replaced a clarifier. Installed 1990.
AOTCO: Bob Gillingham and Elliot Wilke 978-667-8298
Job shop plating facility. Cyanide, electroless nickel and general plating with a flow of 20 GPM. Installed 1988. First installation in field of independent contracting. Cyanide destruct and acid/alkaline treatment.
Valentine Plating: Steve Valentino 413-732-0009
Job shop plating facility. Installed 1989. Cyanide destruct, hexavalent chrome and acid/alkaline treatment. Replaced clarifier system.
Specialized Plating: Paul Kelly, Mike Otero 978-373-8030
Job shop plating, racks and multitude of small barrels. 10 GPM System installed January 2000. Cyanide destruct, electroless nickel and acid/alkaline treatment. Replaced clarifier system.
Hamilton Standard: Ed Moreau 860-654-2729
Captive shop. Treatment removes copper from alkaline cleaner waste. System installed 1993.
Continental Microwave: Jim O'Leary 603-775-5248
Captive shop with hexavalent chrome and acid/alkaline treatment. 20 GPM System installed 2001.
ADTEC: Eric Sideri 978-683-2082
Job shop with hexavalent chrome, electroless nickel, cyanide and acid/alkaline treatment. 60 GPM system installed 2000.
|