banner

References


  • Pape Electroplating: Roger Oetman 860-229-1414 Job shop plating facility. Cyanide, chrome and general plating waste with a flow of 30 GPM. Replaced a clarifier. Installed 1990.

  • AOTCO: Bob Gillingham and Elliot Wilke 978-667-8298 Job shop plating facility. Cyanide, electroless nickel and general plating with a flow of 20 GPM. Installed 1988. First installation in field of independent contracting. Cyanide destruct and acid/alkaline treatment.

  • Valentine Plating: Steve Valentino 413-732-0009 Job shop plating facility. Installed 1989. Cyanide destruct, hexavalent chrome and acid/alkaline treatment. Replaced clarifier system.

  • Specialized Plating: Paul Kelly, Mike Otero 978-373-8030 Job shop plating, racks and multitude of small barrels. 10 GPM System installed January 2000. Cyanide destruct, electroless nickel and acid/alkaline treatment. Replaced clarifier system.

  • Hamilton Standard: Ed Moreau 860-654-2729 Captive shop. Treatment removes copper from alkaline cleaner waste. System installed 1993.

  • Continental Microwave: Jim O'Leary 603-775-5248 Captive shop with hexavalent chrome and acid/alkaline treatment. 20 GPM System installed 2001.

  • ADTEC: Eric Sideri 978-683-2082 Job shop with hexavalent chrome, electroless nickel, cyanide and acid/alkaline treatment. 60 GPM system installed 2000.

  • | Data Tech Water Systems | 5 Vose Hill Rd. Westford MA, 01886 | Tom Weaver |
    | tom@dtwsystems.com | Phone: (978) 692-7230 | Fax: (978) 392-8952 | Mobile: (978) 337-0725 |